INFLUENCE OF PROJECT MONITORING AND EVALUATION ON THE SUSTAINABILITY OF COMMUNITY-BASED PROJECTS IN MANDERA COUNTY, KENYA
Abstract
The purpose of the project was to establish the influence of project monitoring and evaluation on the sustainability of community-based projects in Mandera County. The study utilized descriptive research design. The target population for this study were 2500 different individuals with some interest on projects within Mandela County. Simple random sampling was used to obtain the sample. Questionnaires were used to gather data. Validity was tested from side to side the capability of the analysis tools to the extent which they are believed to compute. For reliability the questionnaires were split into two, administered on participants and the results correlated mathematically through use of spearman correlation to determine the level of consistency other results. A research permit was obtained from National Council for Science and Technology (NACOSTI). The questionnaires were coded once data is collected from the field. Cleaning of the data done then explanatory figures were expended to analyze the statistics through means and correlation of valuables to establish the relationship between sustainability and monitoring and evaluation. On project monitoring and evaluation influencing the sustainability; the study revealed that 63.8 percent of the respondents indicated that monitoring was carried out yearly. The results did not agree with those of all the program officers who noted that monitoring was carried out monthly during the implementation. There is a strong positive correlation between project monitoring and evaluation and sustainability of community-based project. The study concluded that respondents were aware of monitoring and evaluation being carried throughout the year and monthly respectively. The study recommended for need for all community members to participate in the monitoring and evaluation of the project as implementation is taking place since this would help them realize the set goals of the project.
Keywords: Monitoring and Evaluation, Sustainability, Community-based Projects
Full Text:
PDFReferences
Ali, J. B., (2012). Determinants of Community Ownership of Water Projects in Kenya; A Case of Central Division, Isiolo Count. (Unpublished Thesis of the University of Nairobi).
Amadi, J., (2017). The Role of Planning on Performance of Community Projects in Kenya. Developing Country Studies, 7(1), 1-7.
Ceptureanu, S. I. Ceptureanu, E. G. Luchian, C. E. & Luchian, I., (2018). Community Based programs sustainability. A Multidimensional Analysis of Sustainability Factors. Journal of Sustainability. www.mdpi.com/journal/sustainability
Chenga, C. S., Cronje, J. F., & Theron, S. F., (2006). Critical factors for sustainable social projects. The Journal of South Africa Institute of Mining and Metallurgy
Grant, L. K., (2010). Sustainability: From Excess to Aesthetics. Behavior and Social Issues 19 (1): 7–47.
Kiogora, N. M., (2013). Influence of Local Community Involvement in Project Planning on the Sustainability of Projects in Embu County, Kenya. (University of Nairobi, Unpublished Thesis).
Kothari, C. R., (2011). Research Methodology Methods and Techniques. (2nded). New
Age International Publishers: New Delhi.
Lee, C. T., Lim, J.S., Van Fan, Y., Liu, X., Fujiwara, T. and Klemeš, J. J., (2018). Enabling Low-Carbon Emissions for Sustainable Development in Asia and Beyond. Journal of Cleaner Production 176:726–35
Luvega, C., Kirui, K., Oino, P., and Towett, G., (2015). The dilemma in Sustainability of Community based projects in Kenya. Global Journal of advanced research Vol-2, Issue-4 PP. 757-768.
Mugenda, A.G., (2011). Social Science Research. Theory and Principles. Nairobi: Applied Research & Training Services Press.
Mukaria, E. M., (2021). Monitoring, Evaluation practices and sustainability of community-based projects in Embu County, Kenya. (Unpublished Thesis, Kenyatta University).
Munene, K., & Severina N., (2020). Enhancing community participation in project monitoring and evaluation: analysis of community-based projects in informal settlements in Nairobi County, Kenya. International Journal of Social Sciences and information Technology
Mwebia, K. M. & Yusuf, M., (2022). Role of Project Management Life Cycle on Sustainability of Devolved System of Governance Projects in Kenya. International Journal of Management and Commerce Innovations. Vol. 10, Issue 1, pp: (149-159)
Oino, P. G., Towett, G., Kirui, K. K., & Luvega, C., (2015). The dilemma in the sustainability of community-based projects in Kenya. Global journal of advanced research, 2(4), 757-768.
Oke, D. M., Ibrahim, R. L., & Bokana, K.G., (2021). Can Renewable Energy Deliver African Quests for Sustainable Development? The Journal of Developing Areas 55 (1): 319–40
Shabani, N. M., (2020). Effectiveness of monitoring and evaluation systems on the sustainability of community based projects in Kisarawe district, Tanzania, International Journal of Development Research, 10, (03), 34508-34511.
Wasilwa, C., (2015). Effect of Community participation on sustainability of community-based development projects in Kenya. (University of Nairobi. Unpublished Thesis).
Williams, T., (2008). Multiple Uses of common pool resources in Semi-Arid West Africa: A survey of existing practices and Options for sustainable resource management overseas Development Institute (ODI).
Refbacks
- There are currently no refbacks.